Upgrading Pinot with confidence
This page describes the pinot cross-release compatibility test suite.
Pinot has unit and integration tests that verify that the system can work well as long as all components are in the same version. Further, each PR goes through reviews in which Pinot committers can decide whether a PR may break compatibility, and if so, how it can be avoided. Even with all this, it is useful to be able to test an upgrade before actually subjecting a live installation to upgrades.
Pinot has multiple components that run independently of each other. Therefore upgrading a mission-critical pinot cluster will result in scenarios where one component is running an old version and the other a new version of Pinot. It can also happen that this state (of multiple versions) is in place for days together. Or, we may need to revert the upgrade process (usually done in reverse order) -- possibly due to reasons outside of Pinot.
Pinot is highly configurable, so it is possible that there are few installations that use the same combination of configuration options as any one site does. Therefore, it may be that a defect or incompatibility exists with that particular combination of configurations, and went undetected in reviews.
In practice, installations upgrade their deployments to newer versions periodically, or when an urgent bug-fix is needed, or when a new release is published. It is also possible that an installation has not upgraded Pinot for a long time. Either way, it is usually the case that installations will pull in a lot more new/modified software than the feature or bug fix they need.
In a mission-critical pinot installation, the administrators require that during (and certainly after) the upgrade, correctness of normal operations (segment pushes, ingestion from streams, queries, monitoring, etc.) is not compromised..
For the reasons stated above, it is useful to have a way to test an upgrade before applying to the production cluster. Further, it is useful to be able to customize the tests to run using the unique table/schema/configurations/queries combination that an installation is using. If an installation has not upgraded pinot for a long time, it is useful to know what parts may be incompatible during the upgrade process, and schedule downtime if required.
As of release 0.8.0, Pinot has a compatibility tester that you can run before upgrading your installation with a new release. You can specify your own configuration for the pinot components, your table configurations and schema, your queries with your sample data, and run the compatibility suite (you can build one based on the sample test suite provided).
We recommend that you upgrade Pinot components in the following order (if you need to roll back a release, do it in the reverse order).
Controller
Broker
Server
Minion
The test suite runs through an upgrade sequence of upgrading each component one at a time (Controller, Broker, and Server in that order), and then reverting the new versions back to old version (Server, Broker and Controller, in that order). In between each upgrade or downgrade (referred to as a "phase"), a set of test operations (as specified in the test suite) is executed. The operations are specified in a declarative way in yaml files. At present the following operations are supported:
Create a table with a specific table config and schema
Create a segment from an input file and add it to a table
Run the queries specified in a file and verify the results as specified in a file
Create a Kafka topic with specified number of partitions
Ingest rows into the Kafka topic (so that server can consume them)
Delete a table
Delete a segment from a table
One or more of the above set of test operations can be done during each phase in the rollout or roll-back sequence. The test suite does the following steps in sequence
Set up a cluster with old version of controller, broker and server
Stop old controller, start new controller
Stop old broker and start new broker
Stop old server and start new server
Stop new server and start old server
Stop new broker and start old broker
Stop new controller and start old controller
Tests can be run in each phase, (i.e. between any two steps outlined above, or, after the last step). You can create a test suite by writing yaml files for each phase. You may decide to skip any phase by not providing a yaml file for that phase.
The idea here is as follows:
Any persisted files (such as table configs, schemas, data segments, etc.) are readable during and after upgrade.
Any persisted files while in the new release are readable after a rollback (in case that is required).
Protocols between the components evolve in a backward compatible manner.
Minion upgrades is currently not supported in the test framework. Also, testing compatibility of the controller APIs is not supported at this time. We welcome contributions in these areas.
See the yaml files provided along with the source code for examples on how to specify operations for each roll forward/backward stage of the upgrade process.
Running the compatibility test suite
There are two commands available. The first one allows you to identify the versions or builds between which you wish to ascertain compatibility. The second one runs the test suite.
Depending on how old your versions are, you may have some build failures. It will be useful to create the following file as compat-settings.xml
and set it in an environment variable before running the checkoutAndBuild.sh
command:
And the command to run the compatibility test suite is as follows:
You can use command line tools to verify compatibility against a previous release of Pinot (the tools support a --help
option).
Here are the steps to follow before you upgrade your installation
Determine the revision of Pinot you are currently running
This can be a commit hash, or a release tag (such as release-0.7.1
). You can obtain the commit hash from the controller URI /version
.
Determine the version of pinot that you wish to upgrade to
This can be a tag or a commit hash.
Clone the current master
Clone the current source code from Pinot and go to the appropriate directory. This will get you the latest compatibility tester.
Check out and build the two releases
Checkout and build the sources of the two releases you want to verify. Make sure your working directory (-w argument) has enough space to hold two build trees, logs, etc.
Run compatibility regression suite
The command will exit with a status of 0 if all tests pass, 1 otherwise.
NOTE:
You can run the
compCheck.sh
command multiple times against the same build, you just need to make sure to provide a new working directory name each time.You can specify a
-k
option to thecompCheck.sh
command to keep the cluster (Kafka, Pinot components) running. You can then attempt the operation (e.g. a query) that failed.
Query and Data files
So we can use the same data files and queries, upload them as new set of rows (both in Realtime and Offline tables), we encourage you to modify your table schema by adding an integer column called generationNumber
. Each time data is uploaded, the values written as __GENERATION_NUMBER__
in your input data files (or in the query files) are substituted with a new integer value.
This allows the test suite to upload the same data as different segments, and verify that the current data as well as the previously uploaded ones are all working correctly in terms of responding to queries. The test driver automatically tests all previous generation numbers as well.
See the input file and query file in sample test suite for use of this feature.
Consider an input line in the data file like the following:
When this input line is processed to generate a segment or push data into Kafka, the string __GENERATION_NUMBER__
will be replaced with an integer (each yaml file is one generation, starting with 0).
Similarly, consider a query like the following:
Before issuing this query, the tests will substitute the string __GENERATION_NUMBER__
with the actual generation number like above.
Use of generation number is optional (the test suite will try to substitute the string __GENERATION_NUMBER__
, but not find it if your input files do not have the string in them). Another way is to ensure that the set of queries you provide for each phase also includes results from the previous phases. That will make sure that all previously loaded data are also considered in the results when the queries are issued.
Result files
The first time you set up your result files, it is important that you look over the results carefully and make sure that they are correct.
In some cases, Pinot may provide different results each time you execute a query. For example, consider the query:
Since ORDER BY
is not specified, if there are more than 5 results, there is no guarantee that Pinot will return the same five rows every time. In such a case, you can include all possible values of foo
where x = 7
matches, and indicate that in your result file by specifying isSuperset: true
. An example of this feature is shown below:
See the sample test suite for an example of how to use this in the result file.
Sample test suite
The sample test suite provided does the following between each stage of the upgrade:
Add a segment to an offline table
Run queries against new segments, and all old segments added thus far.
Add more rows to Kafka, ensuring that at least one segment is completed and at
least some rows are left uncommitted, so that we can test correct re-consumption of those
rows after rollout/rollback.
Run queries against the data ingested so far.
The table configurations schemas, data and queries have been chosen in such a way as to cover the major features that Pinot supports.
As a good practice, we suggest that you build your own test suite that has the tables, schemas, queries, and system configurations used in your installation of Pinot, so that you can verify compatibility for the features/configurations that your cluster uses.
Last updated